We can organize an interview with Aldin or any of our 25,000 available candidates within 48 hours. How would you like to proceed?
Schedule Interview NowMy name is Mahmood A. and I have over 2 years years of experience in the tech industry. I specialize in the following technologies: Quantity Surveying, Construction Estimating, PlanSwift, Material Take-Off, Cost Estimate, etc.. I hold a degree in Bachelor's degree, Associate's degree, Master of Accountancy (MAcc), Bachelor's degree. Some of the notable projects I’ve worked on include: Construction - value estimating, 112 units Petrise II Block 8, Decorative & Steel Fence Cost Estimation – Washington, USA, Civil and Architectural quantity surveying for one building, Construction-value estimating-Petrie Tower 4(High Rise 24 level 250U), Construction Estimate & takeoffs of "Medical Clinic Gut Renovation", etc.. I am based in Rawalpindi, Pakistan. I've successfully completed 15 projects while developing at Softaims.
I value a collaborative environment where shared knowledge leads to superior outcomes. I actively mentor junior team members, conduct thorough quality reviews, and champion engineering best practices across the team. I believe that the quality of the final product is a direct reflection of the team's cohesion and skill.
My experience at Softaims has refined my ability to effectively communicate complex technical concepts to non-technical stakeholders, ensuring project alignment from the outset. I am a strong believer in transparent processes and iterative delivery.
My main objective is to foster a culture of quality and accountability. I am motivated to contribute my expertise to projects that require not just technical skill, but also strong organizational and leadership abilities to succeed.
Main technologies
2 years
1 Year
1 Year
1 Year
Potentially possible
These are the client requirements, The scope of work is to review architectural drawings for a building that encompasses 100 or so apartment units that range in size from 500-1200 square feet. In these drawings, you will need to determine the amount of the following and input amounts in excel: • 1. All interior doors – Masonite, Lincoln Park – 80” height, quantity per item per unit per floor with total summation • 2. Glass hinged doors (dens) – To match Lincoln Park style – 80” height, quantity per item per unit per floor with total summation • 1. Side glass directly attached to door is included (as per drawings), quantity per item per unit per floor with total summation • 3. Pocket doors – Masonite, Lincoln Park – 80” height (frame included), quantity per item per unit per floor with total summation • 4. Door Jambs – Primed MDF, quantity per item per unit per floor with total summation • 5. Door stops – Primed MDF, quantity per item per unit per floor with total summation • 6. Door casing – Primed MDF – Metrie – MFP4494-16, in linear feet in feet and inches, per unit, per floor with total summation • 7. Baseboards – Primed MDF – Metrie – MFP8246-16,in linear feet in feet and inches, per unit, per floor with total summation • 8. Shoe molding – Primed MDF, in linear feet in feet and inches, per unit, per floor with total summation • 9. Closet shelving – White wire shelf, rod, and bracket (as per drawings), in linear feet in feet and inches, per unit, per floor with total summation • 10. Hardware, quantity per item per unit per floor, with total summation • 1. Door handles & pulls, quantity per item per unit per floor with total summation • 2. Heavy duty pocket door slider kits, quantity per item per unit per floor with total summation • 3. Door stops (if doors stop can’t be installed, hinged stop to be installed), quantity per item per unit per floor with total summation • 4. Bathroom accessories (Taymor Ultra 4 items kit), How many bathrooms per unit per floor with total summation I have completed the above scope of work in couple of days, (well within the deadline).
Estimated internal costs for Steel Fence Type 1 & 2, Cable Rail Fence Type 2, and Decorative Steel Fence Type 1 & 2. Used Planswift for quantity takeoffs and AI-powered tools for rate analysis aligned with Washington market. Generated accurate BOQ-ready cost breakdowns, including core drilling items. Delivered with a quick turnaround, supporting the client’s tender submission with detailed material and labor estimates.
Our goal is to provide accurate take-offs based on the client's BOQ for the construction of a Club House spanning 779 sq.m, including a swimming pool, ramp with RCC walls, and other features. The project, comprising a two-story building with one basement, requires meticulous take-offs completed within three days. With our expertise, we ensure detailed estimates to support project planning and budgeting, exceeding client expectations with precision and efficiency.
Client's Project Goals: The objective of this project is to provide a comprehensive quantity assessment for all materials required for "Trim and Hardware," based on the specifications outlined below. Scope of Work: Review architectural drawings for a building comprising approximately 250 apartment units, ranging in size from 500 to 1200 square feet. The focus is on interior units and corridors. Refer to pages 39-44 in the attached PDF for unit layouts and door details per unit, and page 89 for the interior door schedule ("Door schedule units" in the bottom left corner). Specific Requirements: The trade contractor will install the following items for all units: Interior doors, glass hinged doors (inside units only), pocket doors, door jambs, door stops, door casing, baseboards, shoe molding, closet shelving, and hardware. Provide amounts per unit, per floor, and total summation for each item. Total square footage for all units and common areas, segregated by floor and total summation. Project Timeline: The takeoff estimation for 250 units across 24 stories of a high-rise apartment building was completed within four days. Work commenced on February 21, 2024, with the estimate returned to the client by February 25, 2024. Project Outcome: The project was delivered to the client within the agreed timeline and with precision. The client expressed satisfaction with the quality of work, evident in their acknowledgment through a bonus awarded on March 12, 2024.
The goal of the project is to completed the takeoffs and estimation for the renovation work of the following divisions/items:- Existing conditions (Demolition of different items) Metal (Aluminum partition) Thermal & Moisture Protection (Ceiling) Openings Finishies (Dry wall, paint, tiles etc.) Plumbing HVAC Electrical
Bachelor's degree in Civil Engineering Technology
2014-01-01-2016-01-01
Associate's degree in Diploma of Associate Engineering in Civil Technology
1992-01-01-1995-01-01
Master of Accountancy (MAcc) in
1981-01-01-1991-01-01
Bachelor's degree in
2003-01-01-2005-01-01